733.net

 
Favious | Contact
Search:
 
 
Performance Records

Huangxiao River Box Culvert Dredging,Wuhan

2013/12/24 14:01:25 / 7875


Huangxiao River Box Culvert Dredging,Wuhan

 
Before dredging
 
After dredging

Description

 Works Scale Duration Starting Objective
 5,300m long box culvert
underwater silt:72,000m³
 90 days 2012 Dredging silt in box culvert
silt to be reduced and tumed harmless

Address:Address: 999 Gaoxin Avenue, Donghu New Technologies Development Zone, Wuhan, Hubei Province
Tel:027-86328046 0717-6066366 Fax:
Copyright SafeCleen Technologies Co. Ltd. 2019 all right recevied.
XML 地图 | Sitemap 地图